Indoor playground renovation Rebuild and Relocation
We renovate an old indoor playground into a new, certified one, or relocate it to a new space.
01 Process
Rebuild step by stEp
We reuse the original structure and undamaged parts. We replace covers and colors and add new elements.
- 01 Old playground
- 02 Dismantling
- 03 New covers and colors
- 04 New elements
- 05 Renovated playground
02 Rebuild
From low quality to certified
We rebuild an old or low-quality playground into a new, certified one. We reuse material from the original: steel from the structure, joints and undamaged modules. We also do play area upgrades: new padding, colors and features on the original frame.
- replacement of worn play elements
- layout changes and better use of space
- new design and colors
- addition of new attractions
- adjustment to current standards
03 Indoor playground relocation
We dismantle, transport and rebuild
Dismantling and reinstallation of indoor playground equipment: we take it apart, transport it and rebuild it in a new space. We can also resize it along the way. We relocated playgrounds this way in Hlohovec and Králův Dvůr.

04 When it pays off
A rebuild makes Sense when
- 01
The structure is sound
The steel, connectors and modules are undamaged. Only the padding, nets or elements are worn.
- 02
The playground does not meet the standards
We bring an old or low-quality playground up to the current EN 1176 and EN 1177 standards.
- 03
You want a new look
New colors, design, better use of space and new attractions without buying a whole new playground.
- 04
You are moving your venue
We dismantle, transport and rebuild the playground in the new space, adapted to the new dimensions if needed.
05 Why rebuild
Often faster and cheaper than a new playgrOund
06 Projects
Rebuilt and Relocated
07 Questions and answers
Frequent Questions
Is it worth rebuilding an old playground?
Usually, yes. We reuse the original structure, joints and undamaged modules, so a rebuild is often faster and cheaper than a new playground. After an inspection we tell you whether it pays off.
When is a rebuild better than buying new?
When the load-bearing structure is in good condition and only the padding, nets or elements are worn. We then replace what is needed, change the colors and add new attractions.
How long does relocating a playground take?
It depends on the size. A smaller playground takes a few days, a larger multi-level one roughly one to two weeks including dismantling, transport and installation. We state the exact timing in our offer.
Can you adapt the playground to a new space?
Yes. We measure the new space and adapt the playground to it: a different layout, number of levels or added elements.
Write to us
Describe your space or playground and we will get back to you with a proposal.



